PM's work great for this. That is not what the thread is about.haha
PM's work great for this. That is not what the thread is about.haha
I hope these are still available once Im done spending money on my motor :/.
Rough Draft round 2 should be done around 330 PST! Fixed adjustments, hopefully adding 3000GT logo and CF Cut Through. This one will be on thicker steel.
Dammit Atrosity, you are gonna take all my money! LOL. I'm in for either GTO or 3000GT. Any chance of making the door sills in all aluminum?
I plan on making door sills and shifter trims, I am first making it in stainless steel as it is a lot easier to cut with the laser and it looks really good. The laser takes a lot longer to cut through aluminum then it does with steel but aluminum is a lot easier to cut on the CNC machine.
I plan on making a lot more products and plan to have a website with a lot of goodies for ya guys.
Second prototype will be done today.
Last edited by Atrosity; 09-28-2010 at 04:17 PM.
Prototype Number 2!
The parameter came out perfect as well as the front cut out. I ordered carbon fiber vinyl that will fill in the spaces with a nice cf look. I need to make the logo bigger and I need to run the stock 3000GT font through solidworks. So my next one will say twin turbo. I am adding to the drawing are the screw bolts, so the next product will be installed onto the door.
Last edited by Atrosity; 09-29-2010 at 02:14 PM.
Very nice. Ya I think the logo would look better if it were bigger.
I plan on doing SS instead of Aluminum. If there is a demand I will do aluminum.
Aluminum costs more :/
|
3000gt.com 3000GT / Stealth International WWWboard Archive Jim's (RED3KGT) Reststop |
|
Team 3S 3000GT / Stealth / GTO Information daveblack.net |
|
Michigan 3S MInnesota 3S Wisconsin 3S Iowa, Nebraska, Kansas 3S |
North California 3000GT/Stealth United Society of 3S Owners 3000GT/Stealth/GTO Forums 3000GT/Stealth International |
|
3S National Gathering East Coast Gathering Upper Mid-West Gathering Blue Ridge Gathering |
Bookmarks