$3600 included 22 cubic yards of the fiber strand concrete. All labor, the guy supplied all the equipment (including front loader and labor) and forms, vapor barrier etc. Power troweled smooth then saw cut control joints. All done $3600. 1100 sq ft. I thought it was a good deal. It's dead level and flat. Even the installers of the structure were surprised that they didn't have to do any leveling at all. They said it was so true it made the job very easy.
-Chris




Reply With Quote





Bookmarks