Way off topic but we need some life around here.
I Built a 8x8 platform to set a resin shed on in my yard. Each corner has a post sunk 15-17", my question is should I have put gravel in each hole and also back filled with gravel and top off with dirt? Or for something like this is just dirt fine to fill in the holes? I have it in place and leveled but didn't back fill yet so I could easily fill with gravel. If it's not necessary I rather not put the entire thing back out.
Thanks
Josh


Reply With Quote




Bookmarks