I'm sure we've all got things we hope to do before the NG, some more than others. My list is not a big one, but it's a lot of little projects I hope to get done.
Wire up cruise control and horn to the center console.
Install front lip.
Get underhood engine pieces chromed and installed.
Rebuild subwoofer enclosures.
Install Addco sway bars.
Engine flush and oil change.
AC oil injection.
Swap out cat for test pipe.
Wax and detail whole car and engine.

I'm sure there's more. Seems once I start a project, I find new things to work on. Luckly, I have 2 weeks off before the NG, so I should be able to get most, if not all, done. Just wish it wasn't so damn hot!!