Finised pulling front turbo and going to. ship it for.rebuild tomorrow.
Printable View
Finised pulling front turbo and going to. ship it for.rebuild tomorrow.
Battery died from the heat so I changed it out. Also freshened it up with some new Twin Turbo stickers :).
Lapped for 160 miles, im tired as hell
Fired her up and took her for a ride.
Finished putting the interior together.
found a cheap 10x12x4.5" intercooler core I might look at jigging to fit in the side of the car.
tell us more about that.. sign up?
Work Done to others cars!!!
Two weeks ago: 99 conversion - Local Member.
Last weekend: Installed B&G springs, KYB Struts, Adjustable Rear Control arms - Local Car
Today - Pressure test VR-4 and basic Tuneup - Local Car
This Weekend - Install Exhaust On Yoshi's VR-4
This Month - Possible Engine rebuild or Swap on a 96 VR-4 Spyder Bad Head Gasket - Local Car
Completed on my car this month:
Replaced Prosport Fuel Pressure gauge - Warranty Claim
New Battery and battery box behind rear seats
2nd Gen Stealth rear bumper painted and installed
Finally got the wax off the flat black paint - Magic Eraser worked!!!!
Work completed on the Half Cut Stealth Trailer:
Wired in all lights
Rear bumper installed
Cut out all additional un-needed supports
Removed stock rear brakes
Slowly getting it enclosed with sheet metal