Hopefully all wrapped up by the end of September.
I have a midcase at pct to design a midcase brace but Corona pushed that back. Hopefully he'll have one ready for me to install sometime soon, the transmission is ready to go back together otherwise.
I'm thinking the intercooler piping should be all tacked up by the weekend and possibly even started getting them welded up.
Heres the list of the things remaining, its really not that much at all:
Oil and fluids
Belts
Weld Valve cover baffles
Weld manifolds
Weld wastegate dump tube
Wiring harness
Reseal brakes
Weld intercooler piping
Weld bov flange
Build transmission
Assemble interior
Wire in COP
Wire in gauges
I'm going to take the engine back out to re-lube everything before final assembly since its been sitting for so long.
Sent from my SM-G986U using Tapatalk