My light restoration project
by
, 09-17-2010 at 04:47 PM (2496 Views)
I thought I would start up a project thread just to keep track of everything that has been done to my car. I hope to stay on top of this and keep it updated. I'll post pics when I have them. I wish I would have taken more pics to document the things done, but I will try to get better about it. Here's a short list of things that need to be done to the car.
- Replace control arm with alignment - Done
- Fix the busted oil pressure gauge - Done
- Replace outside door weatherstripping - Done
- Machine front rotors - Done
- Replace intake coupler - Done
- Replace front wiper motor - Done
- Replace fuel cap - Done
- Install battery hold down kit (This scared me when I noticed the battery was just floating around in there) - Done
- Transmission Flush - Done
- Replace shift knob and shift boot - Done
- Replace upper and lower coolant hoses - Done
- Install cup holder - Done
- Install ashtray - Done
- Replace ebrake and fix the mounting points - Done
- Fix clutch leak - Done
- Replace rear wiper motor - Done
- Beat dent out of oil pan - Done
- Replace sunroof regulator - Done
- Replace battery cables - Done
- Rebuild Transmission - Done
- Replace sunvisors
- Replace carpet
- Replace cargo cover clips
- Replace exhaust
- Restore steering wheel
- Replace D/S seat belt holder
- Paint entire car
- Replace TT and Active Aero decals
- New wheels
- Replace leathers
- Replace missing trunk compartment cover
I have a long way to go...wish me luck!